Great to see your posts Paul! Thats some sick details and weathering for sure. I am really liking those flop-over derails. Thats some really good details that I need many of, on my outfit. That GTW car looks great. I got retired a bit earlier than I wanted, but so far its all good. How long do you have left as a signal maintainer (engineer) before you can un-tire? Also, are you guys doing the whole PTC signaling thing too?
Yes still working I’m actually Project Director rolling out ETCS level 2 which is full Incab Signalling . I think I have 5 years left in me but we will see. Yes the derailers are excellent adds another label of operations to the layout Sent from my iPhone using Tapatalk
It ended up being a productive weekend with the styrene sheets added to the warehouse and the doors and roof cut in. Still need to add details etc but so far so good. It’s not perfect by any means due to a few errors however I’m happy with the end result. Sent from my iPhone using Tapatalk
Looking great Paul! Saw you on Andy and Mike's 2nd Section this past week. The presentation you did on your layout was awesome and I'll re-watch it again. Your layout is in inspiring me to get the HO Athearn Studio layout done, soon as I can layout out a reasonable track plan.