Goal 1: Never made it this point. Weather held up replacing the basement windows, then overtime at work stopped so I chose to focus on items I already had on hand. Goal 2: Found a better plan than a suspended helix over a helix. Goal 3: I did get about 80% of backdrop installed on the upper level. However, I made progress on the upper level track work, backdrop and roughing in scenery. Helix is still an attainable goal this spring!