MILW Greg's Coast Division Layout part. 2

Greg Lussier Sep 9, 2006

  1. Greg Lussier

    Greg Lussier TrainBoard Supporter

    546
    196
    23
    The title of my layout has changed (old was lines west) but the idea is still the same.

    I also created a new thread because the other was so long. A new project, thus a new thread.

    Anyhow, a little update on the construction of the Columbia River Bridge at Beverly! At the moment, I have set up a tabletop and some foam for the west end of the bridge. I am measuring and scaling right now. What you see before you is a 6-foot long tabletop. At the end of the tabletop is the beginning of the middle sand bar/island (eastward) in the Columbia River; this isn't even the middle point of the bridge. This is definitely going to be a big project!!!

    Don't worry about the tall tower lying in there. I will be cut down to the correct size soon.

    [​IMG]

    Greg
     
  2. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,640
    23,047
    653
    This is going to be VERY interesting!

    :D

    Boxcab E50
     
  3. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,052
    27,669
    253
    Just how long will this bridge be when done?? 20 feet?
     
  4. Kurt Moose

    Kurt Moose TrainBoard Member

    9,852
    14,306
    147
    :eek:mg: :eek:mg: :eek:mg: :cool:
     
  5. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,640
    23,047
    653
    The real thing- Bridge itself is over 3000 feet long. Plus whatever he adds at either end. So, without compressing, convert that to N.... !!!!! :eek:mg:

    :D

    Boxcab E50
     
  6. Greg Lussier

    Greg Lussier TrainBoard Supporter

    546
    196
    23
    In N scale, 160 feet is equal to 1 foot in reality. So 3000 N scale feet divided by 160 feet equals 18.75 feet in reality.

    I hope I did that right. If I'm worng here in my math someone let me know. I just woke up and probably shouldn't be trying to figure this out quite yet.

    When I took a ruff estimate before I got this far in building it, I was thinking it would be around 15 to 16 feet long, as I am shorting each truss just a little bit. For example, every truss will have the correct number of diagonal beams but the will be just a little closer together. It is just enough to allow this thing to fit correctly in my storage area but still give off the right impression. I think that unless someone takes out an n scale ruler, it will look like it is to perfect scale. That is how remote of a difference the shorting will make.

    By the way, I just picked up a set of 6 deluxe inn. milw woodchip cars and was wondering if any of you know who makes loads for these things?
     
  7. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,640
    23,047
    653
    Greg-

    How much will you be adding at each end? Looks like you're doing Beverly Junction?

    For chip loads, check:

    http://www.deluxeinnovations.com/scenery/scenloads01.html

    Also, did you get the six pack of chip cars? All different numbers? There is a seventh car! They sold a single, and the six pack.

    :D

    Boxcab E50
     
  8. Greg Lussier

    Greg Lussier TrainBoard Supporter

    546
    196
    23
    Thanks Ken! I picked up the 6 pack. did not know the single had a different rd number. I will have to keep an eye out for it.

    On the east end there will be just a little bit of land, probably just before the first switch in Beverly yard.
     
  9. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,640
    23,047
    653
    Greg-

    Mine are no longer shrink wrapped. Mixed together. If you give me those numbers of the six you have, I can find that single number for you?

    :D

    Boxcab E50
     
  10. Greg Lussier

    Greg Lussier TrainBoard Supporter

    546
    196
    23
    #'s
    276103
    276137
    276042
    276146
    276089
    276005

    Thank you Ken.
     
  11. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,640
    23,047
    653
    276100

    :teeth:

    Boxcab E50
     
  12. Greg Lussier

    Greg Lussier TrainBoard Supporter

    546
    196
    23
    Worked a little more on the bridge. I now have a total of two finished trusses. These things take a long time to build when you’re doing it from scratch...

    Anyhow this a quick mock-up pic with some background colors. Nothing fancy but it got rid of the messy background that was actually shown.

    Bridge piers will come when all the trusses are finished.

    [​IMG]
     
    Last edited by a moderator: Oct 4, 2006
  13. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,640
    23,047
    653
    When your module is finished, will we be viewing it primarily from the south side?

    :thumbs_up:

    Boxcab E50
     
  14. Greg Lussier

    Greg Lussier TrainBoard Supporter

    546
    196
    23
    Right now I am still debating it. I have background photos of whichever direction I choose to view it from. My layout diagram currently shows it will be viewed from the south or looking towards the dam and vantage. the picture I just posted would have been taken from the northside as Beverly-Jct. is going to be to the right of the photo.
     
  15. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,640
    23,047
    653
    That's what I thought.......

    :D

    Boxcab E50
     
  16. Kurt Moose

    Kurt Moose TrainBoard Member

    9,852
    14,306
    147
    Your a very brave and dedicated man!! Keep up the awesome work and we all can't wait to see it, especially in person!! :eek:mg:
     
  17. Greg Lussier

    Greg Lussier TrainBoard Supporter

    546
    196
    23
    Thank you for all the encouragement guys. I guess you all deserve a treat for treating me so well. Hahaha!

    He is a little sneak peek of what I'm also currently building. It is the Boylston Depot. A rather rare and unseen depot due to is desolate location, should make modeling it rather unique. Boylston is located at the summit of the Boylston Mountains (which is kind of a small section of the Saddle Mountains) next to the west portal of the Johnson Creek Tunnel (#45) (AKA Boylston Tunnel). This would put it east of the Renslow Trestle.

    I will be working on both the Columbia River Bridge and Boylston, trading off and on. Still lots to do. There's no stopping me now!!!


    [​IMG]
     
  18. HemiAdda2d

    HemiAdda2d Staff Member TrainBoard Supporter

    22,052
    27,669
    253
    WOw! That bridge is really taking shape! Looking good!
     
  19. Kurt Moose

    Kurt Moose TrainBoard Member

    9,852
    14,306
    147
    Ooooooh!! I love Milw. depots!:cool: Oh, and that pic that your using for your sig, one word, AWESOME!! I thought it was a real one for a second look!:teeth:
     
  20. BoxcabE50

    BoxcabE50 HOn30 & N Scales Staff Member TrainBoard Supporter

    67,640
    23,047
    653
    Cool! Two fantastic projects at once! This is great!

    :thumbs_up: :thumbs_up: :thumbs_up:

    Boxcab E50
     

Share This Page