SwitchWithIt 1.7.10.12 Available

ncng Oct 31, 2021

  1. ncng

    ncng TrainBoard Member

    695
    74
    28
    Another small update. Download at: https://sourceforge.net/projects/switchwithit/

    Occasionally at our model railroad club we would have trains go into staging that exceeded the length of the track. I finally figured out why. The track lengths for the tracks in staging were defined as 500 scale feet long. The route the trains run to get to staging defined the last segment of the route as being 900 scale feet long. The conflict in lengths resulted in the route overriding the track definition.

    Anyway, for right now, I have added an update to the help file to make sure users are aware of this conflict and to make sure their routes are in agreement with the track lengths. I have also made a couple of other changes that are contained in the Readme file that accompanies the installation.

    David
     
  2. ncng

    ncng TrainBoard Member

    695
    74
    28
    The 3rd sentence in one of the paragraphs above should state, "The route the trains run on to get to staging defined the last segment as allowing trains up to 900 scale feet long." The route definition does not define how long each track segment is only how long the trains can be on that segment. Sorry for any confusion.

    David
     

Share This Page